Shopping Cart
Your Cart is Empty
Quantity:
Subtotal
Taxes
Shipping
Total
There was an error with PayPalClick here to try again
CelebrateThank you for your business!You should be receiving an order confirmation from Paypal shortly.Exit Shopping Cart

Friends of Ashby Bath Grounds

News Articles

News Articles

Royal Hotel Car Park Update.

Posted by [email protected] on April 28, 2020 at 11:20 AM

The Royal Hotel car park, which was closed to public use last year, is currently being used as a depot for the contractors laying a new gas main along Tamworth Road. Unfortunately, this is not counted as a change of use and does not require new planning permission. We understand that they are permitted to work on the site between 7:30am and 6:30pm.

Here is the full text of a communication from the Ditrsict Council explaining the planning position.


Class A (gas transporters) of Part 15 (Power related development) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (‘The Order outlines that permitted development (i.e. development which has deemed consent) includes:

 (a) The laying underground of mains, pipes or other apparatus; and

 (d) The placing and storage on land of pipes and other apparatus to be included in a main or pipe which is being or is about to be laid or constructed in pursuance of planning permission granted or deemed to be granted under Part 3 of the Act (control over development).

 The reference to ‘Part 3 of the Act’ is reference to Part 3 of the Town and Country Planning Act 1990 which specifies under Part (2) criterion (c) that the carrying out by a statutory undertaker of any works for the purpose of inspecting, repairing or renewing any main pipes, including the breaking open of any street or other land for that purpose, is not considered to involve “development of the land.”

 Development ‘permitted’ by Class A of Part 15 is subject to conditions and one particular condition, in this case, would be condition (b) which states that:

 “in the case of any Class A(d) development, on completion of the laying or construction of the main or pipe, or at the expiry of a period of 9 months from the beginning of the development, whichever is the sooner, any pipes or other apparatus still stored on the land are removed and the land restored as soon as reasonably practicable to its condition before the development took place (or any other condition which may be agreed with the local planning authority).”

 Separately to this Class A (Temporary Buildings and Structures) of Part 4 (Temporary Buildings and Uses) of The Order outlines that permitted development also includes “the provision on land of buildings, moveable structures, works, plant or machinery required temporarily in connection with and for the duration of operations being or to be carried out on, in, under or over the land or on land adjoining that land.”

 Development ‘permitted’ by Class A of Part 4 is subject to the following conditions which apply when the operations have been carried out:

 (a) Any building, structure, works, plant or machinery permitted by Class A is removed, and

 (b) Any adjoining land on which development permitted by Class A has been carried out is, as soon as reasonably practicable, reinstated to its condition before that development was carried out.

 Overall I would be of the view that the proposal has deemed consent via The Order and a formal planning application would not be required for the works which have/are to be carried out.

Categories: Bath Grounds News, Projects

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

92 Comments

Reply Agisped
11:12 PM on August 27, 2021 
http://buypropeciaon.com/ - propecia or rogaine
Reply Propecia
10:21 PM on August 31, 2021 
Viagra Frau Lust
Reply slEesia
8:27 PM on September 4, 2021 
http://buystromectolon.com/ - ivermectin dosage for scabies
Reply viagra discount pharmacy
11:42 PM on September 4, 2021 
Vente De Cialis Pas Cher
Reply arrinkigo
2:02 AM on September 6, 2021 
Propecia
Reply Issuexvix
4:18 AM on September 6, 2021 
Reply gaskmeatt
9:46 PM on September 6, 2021 
Reply fadogreaf
10:14 PM on September 8, 2021 
cialis without prescription
Reply Ticspioli
3:23 AM on September 9, 2021 
Stromectol
Reply Stromectol
8:05 AM on September 11, 2021 
Que Es Cialis O Levitra
Reply Cialis
4:28 AM on September 12, 2021 
Accidents Avec Clomid
Reply FlurgEm
2:26 AM on September 15, 2021 
Reply azithromycin at walgreens
7:43 AM on September 18, 2021 
Tetracycline Vendors
Reply Xhdfilmstp
4:42 PM on September 18, 2021 
Reply AAbpciw
11:46 AM on September 19, 2021 
?????????? 2 ????? https://bit.ly/39ioLkW ???????? ?????? ??? ?????????? 2 ????? ?? ???.
???? ??? ????? ???????? ???. ?????????? ??? 2 ????? 1-2 ?????
Reply AlletsJes
7:05 PM on September 19, 2021 
https://buypriligyhop.com/ - can i buy priligy over the counter
Reply boiluelia
3:25 AM on September 20, 2021 
http://buyplaquenilcv.com/ - how does plaquenil work
Reply esseliady
9:39 AM on September 20, 2021 
azithromycin coronavirus
Reply Vallie
8:03 PM on September 20, 2021 
Reply Vallie
8:03 PM on September 20, 2021 
0